Introduction

Marine transport equipment for heavy cargo

Port Name Pier Open-air Yard (§³) Major Cargo
Gwangyang Port General Pier 420,000 Coil, iron plates, wire rods, miscellaneous goods
Incheon Port Pier 3 12,752 Supplementary materials for feed, forest products, steel
Pohang Port Pier 7 28,754 Coil, iron plate, ore, nonferrous metal
Ulsan Port Piers 6, 7, 8 15,442 Resin, ore, fertilizer, equipment, miscellaneous goods
New Port Pier 98,064 Petrochemicals, miscellaneous goods
Masan Port Pier 4 133,600 Equipment, heavy cargo
Gunsan Port Piers 3, 5, 7 294,433 Supplementary materials for feed, forest products, pulp, talcum, roll paper
Donghae Port Limestone Pier 300,000 Limestone
Pyeongtaek Port Pyeongtaek Dangjin Central Pier 311,300 Supplementary materials for feed, forest products, miscellaneous goods
Mokpo Port Daebul(#64 TOC)Pier 81,030 Miscellaneous goods, steel

Introduction

Introduction

Land Transport Equipment for Heavy Cargo

Equipment TON Number Owned TOTAL AXLE
Transport
capability(TON)
Remarks
POWER PACK 290 KW 12 290 KW
L:3.7 m W:2.43 m H:1.13 m
MULTI MODULE TRANSPORTER (KAMAG) 180 TON 28 168 5,040
L:8.4m W:2.43 m H:1.49m ±350 mm
120 TON 6 24 720
L:5.6m W:2.43 m H:1.49m ¡¾350 mm
60 TON 4 8 240
L:2.8m W:2.43 m H:1.49m ¡¾350 mm
Subtotal 38 200 6,000
SELF MODULE TRANSPORTER (GOLDHOPER) (SCHEUERLE) 150 TON 2 12 300
L:9m W:3m H:1,175m ¡¾300mm
NON SELF MODULE TRANSPORTER (GOLDHOPER) 150 TON 8 48 1,200
L:9m W:3m H:1,175m ¡¾300mm
100 TON 2 8 200
L:6m W:3m H:1,175m ¡¾300mm
75 TON 4 24 300
L:9m W:1.5m H:1,175m ¡¾300mm
Subtotal 16 92 2,000
PM TRACTOR 100 TON 1 250
L:8.22m W:2.98m H:3.38 mm
150 TON 1 300
L:7.5m W:2.48m H:3.08m
300 TON 1 350
L:7.22m W:2.49m H:3.84m
Subtotal 3 900

Marine Transport Equipment for Heavy Cargo

Equipment Specification and tonnage Number Owned Remarks
TUG BOAT 3,480 HP 1 Vessel
FLAT BARGE 8,000 TON 1 Vessel
FLAT BARGE 17,000 TON 1 Vessel

Introduction

Equipment

Equipment Tonnage
SEBANG KRAMO 7,200 TON (3,600 TON X 2 SET)

Equipment for Installation of Heavy Cargo

Equipment Tonnage
SEBANG KRAMO 7,200 TON (3,600 TON X 2 SET)